INTERNATIONAL PROJECTS EPC & TURNKEY

Name of work
Lumsum Turnkey (LSTK) of Balance of Plant (BoP) package for 1 x 350 MW Thermal Power Plant - KVK Nilachal Power Pvt. Ltd.,

Site
Cuttack, Odisha, India

Client
M/s. KVK Nilachal Power Pvt. Ltd.

Customer
M/s. KVK Energy

Project Duration
18 Months

Our Scope of Work
Design, Engineering, Supply and Erection of Balance of Plant (BoP) Packages
- Coal Handling Package
- Ash Handling Package
- Water System package (CW & ACW, WTP)
- Fire Detection & Protection System
- Fuel Oil Handling System
- Heat Ventilation & Air Conditioning System
- Piping
- Cooling Tower
- Electrical Balance of Plants (E-BoP) & Switchyard
- Associated Control & Instrumentation works

Date of Completion
Ongoing
Name of work
LSTK of Balance of Plant (BoP) package for 2 X 350 MW Coastal Thermal Power Project.

Site
Krishnapatinam,Andhra Pradesh, India

Client
M/s. CCCL-EDAC Energy Ltd., Chennai.

Customer
M/s. Meenakshi Energy Private Ltd., Noida ( GDF Suez)

Project Duration
30 Months

Our Scope of Work
Design, Engineering, Supply and Erection of Balance of Plant (BoP) Packages
- Coal Handling Package
- Ash Handling Package
- Water System package (CW & ACW, WTP)
- Fire Detection & Protection System
- Heat Ventilation & Air Conditioning System
- Piping
- Induced Draft Cooling Tower
- Fuel Oil Handling System
- Electrical Balance of Plants (E-BoP) & Switchyard
- Associated Control & Instrumentation works

Date of Completion
Ongoing
Name of work
Balance of System (BoS) on EPC basis for 24.7MWp capacity floating solar Photovoltaic Power Plant with 5yrs O&M at Tuticorin

Site
Tuticorin, Tamilnadu

Client
M/s. Greenam Energy Private Ltd

Customer
M/s. Greenam Energy Private Ltd

Project Duration
30 Months

Our Scope of Work
-Installation of Floaters, Solar PV Panels (Free Issue)
-Balance of Systems on Engineering Procurement Construction (EPC) basis
-5yrs O&M

Date of Completion
on going